Triple

T22276946
Position Surface form Disambiguated ID Type / Status
Subject FM 544 E550631 entity
Predicate hasJunctionWith P1018 FINISHED
Object State Highway 190 (President George Bush Turnpike) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Highway 190 (President George Bush Turnpike) | Statement: [FM 544, hasJunctionWith, State Highway 190 (President George Bush Turnpike)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Highway 190 (President George Bush Turnpike)
Context triple: [FM 544, hasJunctionWith, State Highway 190 (President George Bush Turnpike)]
  • A. Texas State Highway 198
    Texas State Highway 198 is a state-maintained roadway in Texas that connects several communities in the East Texas region, including Gun Barrel City.
  • B. Texas State Highway 19
    Texas State Highway 19 is a north–south state highway in eastern Texas that connects several rural communities and small cities between Huntsville and Paris.
  • C. Texas State Highway 91
    Texas State Highway 91 is a state highway in North Texas that serves as a key north–south route connecting the cities of Sherman and Denison and providing access toward the Oklahoma border.
  • D. Highway 90
    Highway 90 is a major north–south Israeli highway running the length of the country from the Lebanese border down through the Jordan Valley to Eilat.
  • E. Texas State Highway 191
    Texas State Highway 191 is an east–west state highway in West Texas that connects the cities of Midland and Odessa, serving as a major regional commuter and commercial route.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: State Highway 190 (President George Bush Turnpike)
Target entity description: State Highway 190, commonly known as the President George Bush Turnpike, is a major toll highway forming part of the outer loop around the Dallas–Fort Worth metropolitan area in Texas.
  • A. Texas State Highway 198
    Texas State Highway 198 is a state-maintained roadway in Texas that connects several communities in the East Texas region, including Gun Barrel City.
  • B. Texas State Highway 19
    Texas State Highway 19 is a north–south state highway in eastern Texas that connects several rural communities and small cities between Huntsville and Paris.
  • C. Texas State Highway 91
    Texas State Highway 91 is a state highway in North Texas that serves as a key north–south route connecting the cities of Sherman and Denison and providing access toward the Oklahoma border.
  • D. Highway 90
    Highway 90 is a major north–south Israeli highway running the length of the country from the Lebanese border down through the Jordan Valley to Eilat.
  • E. Texas State Highway 191
    Texas State Highway 191 is an east–west state highway in West Texas that connects the cities of Midland and Odessa, serving as a major regional commuter and commercial route.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e44d538819097c6b8f333af3352 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f14ea8a6688190bcd168670420ec59 completed April 29, 2026, 12:19 a.m.
Created at: April 16, 2026, 8:40 p.m.