Triple

T22266915
Position Surface form Disambiguated ID Type / Status
Subject North–South relations E550374 entity
Predicate instanceOf P0 FINISHED
Object social science concept C9031 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: social science concept
Context triple: [North–South relations, instanceOf, social science concept]
  • A. social science
    Social science is the systematic study of human society, social relationships, and institutions using empirical and theoretical methods to understand patterns of behavior and social structures.
  • B. social theory concept chosen
    A social theory concept is an abstract idea or framework used to explain, interpret, and analyze patterns, structures, and dynamics within societies and social relationships.
  • C. social science laboratory
    A social science laboratory is a controlled research environment where social scientists systematically study human behavior, social interactions, and societal processes using empirical methods and experimental or observational designs.
  • D. social science journal
    A social science journal is a periodical publication that presents peer-reviewed research, theoretical analyses, and critical discussions on human behavior, societies, and social institutions.
  • E. social scientist
    A social scientist is a researcher who systematically studies human behavior, social relationships, and societal structures using empirical methods to understand and explain social phenomena.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e43d8208190aff4f9cf7f2c2a8a completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:39 p.m.