Triple

T22239087
Position Surface form Disambiguated ID Type / Status
Subject London Liverpool Street–Great Yarmouth (via Norwich) E549672 entity
Predicate instanceOf P0 FINISHED
Object long-distance rail service C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-distance rail service
Context triple: [London Liverpool Street–Great Yarmouth (via Norwich), instanceOf, long-distance rail service]
  • A. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • B. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • C. intercity coach service
    An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
  • D. high-speed rail service brand
    A high-speed rail service brand is a distinct identity and marketing concept that represents a specific provider’s fast, long-distance passenger train services, encompassing its name, visual design, service standards, and customer experience.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4102b881909cf47d3768e25c19 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:38 p.m.