Triple
T22239087
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | London Liverpool Street–Great Yarmouth (via Norwich) |
E549672
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | long-distance rail service |
C75
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: long-distance rail service Context triple: [London Liverpool Street–Great Yarmouth (via Norwich), instanceOf, long-distance rail service]
-
A.
passenger rail service
chosen
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
-
B.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
C.
intercity coach service
An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
-
D.
high-speed rail service brand
A high-speed rail service brand is a distinct identity and marketing concept that represents a specific provider’s fast, long-distance passenger train services, encompassing its name, visual design, service standards, and customer experience.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4102b881909cf47d3768e25c19 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:38 p.m.