Triple

T22218938
Position Surface form Disambiguated ID Type / Status
Subject A21 motorway (Portugal) E549153 entity
Predicate isPartOfCorridor P35 FINISHED
Object Lisbon–Ericeira corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lisbon–Ericeira corridor | Statement: [A21 motorway (Portugal), isPartOfCorridor, Lisbon–Ericeira corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lisbon–Ericeira corridor
Context triple: [A21 motorway (Portugal), isPartOfCorridor, Lisbon–Ericeira corridor]
  • A. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • B. Lisbon–Madrid road corridor
    The Lisbon–Madrid road corridor is a major transnational highway route linking Portugal’s capital Lisbon with Spain’s capital Madrid, facilitating significant passenger and freight transport between the two Iberian countries.
  • C. Aveiro–Vilar Formoso international corridor
    The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
  • D. Lisbon–Covilhã
    Lisbon–Covilhã is a long-distance Intercidades rail service in Portugal connecting the capital city Lisbon with the inland city of Covilhã across the country’s central region.
  • E. Beira Corridor
    The Beira Corridor is a key transport route in southeastern Africa that links landlocked countries such as Zimbabwe, Zambia, and Malawi to the Indian Ocean via the port city of Beira in Mozambique.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lisbon–Ericeira corridor
Target entity description: The Lisbon–Ericeira corridor is a key transport axis in western Portugal linking the Lisbon metropolitan area with the coastal town of Ericeira and surrounding communities.
  • A. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • B. Lisbon–Madrid road corridor
    The Lisbon–Madrid road corridor is a major transnational highway route linking Portugal’s capital Lisbon with Spain’s capital Madrid, facilitating significant passenger and freight transport between the two Iberian countries.
  • C. Aveiro–Vilar Formoso international corridor
    The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
  • D. Lisbon–Covilhã
    Lisbon–Covilhã is a long-distance Intercidades rail service in Portugal connecting the capital city Lisbon with the inland city of Covilhã across the country’s central region.
  • E. Beira Corridor
    The Beira Corridor is a key transport route in southeastern Africa that links landlocked countries such as Zimbabwe, Zambia, and Malawi to the Indian Ocean via the port city of Beira in Mozambique.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e403d6481909a94d0aaf157f6ef completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12b8edd288190a49f10e009122057 completed April 28, 2026, 9:50 p.m.
Created at: April 16, 2026, 8:37 p.m.