Triple
T22205192
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Directorate of Public Works (USAG West Point) |
E548787
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public works organization |
C694
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public works organization Context triple: [Directorate of Public Works (USAG West Point), instanceOf, public works organization]
-
A.
organization
chosen
An organization is a structured group of people and resources coordinated to achieve shared goals or perform specific functions.
-
B.
public works ministry
A public works ministry is a government department responsible for planning, developing, and maintaining public infrastructure and services such as roads, bridges, water systems, and public buildings.
-
C.
public works project
A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
-
D.
public office
A public office is an official position of authority and responsibility within a government or public institution, held to serve the interests and welfare of the public under established laws and regulations.
-
E.
company
A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e3ecc7c8190b5f94cd8f42e9d37 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:36 p.m.