Triple

T22181532
Position Surface form Disambiguated ID Type / Status
Subject Agency for Defense Development E548179 entity
Predicate notableProject P4 FINISHED
Object K-SLBM (Korean Submarine-Launched Ballistic Missile) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: K-SLBM (Korean Submarine-Launched Ballistic Missile) | Statement: [Agency for Defense Development, notableProject, K-SLBM (Korean Submarine-Launched Ballistic Missile)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: K-SLBM (Korean Submarine-Launched Ballistic Missile)
Context triple: [Agency for Defense Development, notableProject, K-SLBM (Korean Submarine-Launched Ballistic Missile)]
  • A. North Korean Hwasong missile family
    The North Korean Hwasong missile family is a series of domestically developed ballistic missiles of varying ranges that form the core of North Korea’s strategic and tactical missile arsenal.
  • B. K-4
    K-4 is a state highway in Kansas that runs across much of the state, connecting numerous rural communities and serving as an important east–west route.
  • C. R-2 missile
    The R-2 missile was an early Soviet short-range ballistic missile, an improved derivative of the German V-2, used primarily for military purposes and high-altitude research in the early Cold War period.
  • D. K-4 SLBM
    The K-4 SLBM is an Indian nuclear-capable submarine-launched ballistic missile designed to provide second-strike capability from the country’s ballistic missile submarines.
  • E. KJ-2000
    The KJ-2000 is a Chinese airborne early warning and control (AEW&C) aircraft based on the Il-76 airframe, equipped with a large phased-array radar for long-range airspace surveillance and battle management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: K-SLBM (Korean Submarine-Launched Ballistic Missile)
Target entity description: The K-SLBM is South Korea’s indigenous submarine-launched ballistic missile, developed to enhance the country’s underwater strategic strike and deterrence capabilities.
  • A. North Korean Hwasong missile family
    The North Korean Hwasong missile family is a series of domestically developed ballistic missiles of varying ranges that form the core of North Korea’s strategic and tactical missile arsenal.
  • B. K-4
    K-4 is a state highway in Kansas that runs across much of the state, connecting numerous rural communities and serving as an important east–west route.
  • C. R-2 missile
    The R-2 missile was an early Soviet short-range ballistic missile, an improved derivative of the German V-2, used primarily for military purposes and high-altitude research in the early Cold War period.
  • D. K-4 SLBM
    The K-4 SLBM is an Indian nuclear-capable submarine-launched ballistic missile designed to provide second-strike capability from the country’s ballistic missile submarines.
  • E. KJ-2000
    The KJ-2000 is a Chinese airborne early warning and control (AEW&C) aircraft based on the Il-76 airframe, equipped with a large phased-array radar for long-range airspace surveillance and battle management.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3d53f88190a2b690e3f25bb062 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12aa5998081909ff35f8b5df4f92f completed April 28, 2026, 9:46 p.m.
Created at: April 16, 2026, 8:35 p.m.