Triple

T22146264
Position Surface form Disambiguated ID Type / Status
Subject AquaLogic Enterprise Service Bus E547295 entity
Predicate instanceOf P0 FINISHED
Object integration software C227 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: integration software
Context triple: [AquaLogic Enterprise Service Bus, instanceOf, integration software]
  • A. integrated software platform
    An integrated software platform is a unified system that combines multiple applications and tools into a single environment to streamline workflows, data sharing, and user experience.
  • B. integration approach
    An integration approach is a conceptual strategy that defines how separate systems, components, or processes are connected and coordinated to function together as a unified whole.
  • C. integration component
    An integration component is a modular software element that connects and coordinates interactions between disparate systems, services, or applications to enable seamless data and process flow.
  • D. data integration platform
    A data integration platform is a system that connects, transforms, and consolidates data from disparate sources into a unified, accessible, and consistent view for analysis and operational use.
  • E. software chosen
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3a95d88190a3bd80d9471976c3 completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:33 p.m.