Triple

T22143250
Position Surface form Disambiguated ID Type / Status
Subject Pearl River County, Mississippi E547218 entity
Predicate hasMajorHighway P385 FINISHED
Object Mississippi Highway 53 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi Highway 53 | Statement: [Pearl River County, Mississippi, hasMajorHighway, Mississippi Highway 53]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 53
Context triple: [Pearl River County, Mississippi, hasMajorHighway, Mississippi Highway 53]
  • A. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • B. Mississippi Highway 43
    Mississippi Highway 43 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities with larger regional routes and population centers.
  • C. Mississippi Highway 503
    Mississippi Highway 503 is a state highway in Mississippi that serves as a regional connector route in the east-central part of the state, including access to the town of Decatur.
  • D. Mississippi Highway 13
    Mississippi Highway 13 is a state highway in Mississippi that runs generally north–south, connecting several rural communities and counties in the central part of the state.
  • E. Mississippi Highway 39
    Mississippi Highway 39 is a state highway in eastern Mississippi that runs north–south through several counties, connecting rural communities to larger regional routes and towns.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 53
Target entity description: Mississippi Highway 53 is a state highway in southern Mississippi that runs generally north–south, connecting rural communities and providing a regional route through Pearl River County and surrounding areas.
  • A. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • B. Mississippi Highway 43
    Mississippi Highway 43 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities with larger regional routes and population centers.
  • C. Mississippi Highway 503
    Mississippi Highway 503 is a state highway in Mississippi that serves as a regional connector route in the east-central part of the state, including access to the town of Decatur.
  • D. Mississippi Highway 13
    Mississippi Highway 13 is a state highway in Mississippi that runs generally north–south, connecting several rural communities and counties in the central part of the state.
  • E. Mississippi Highway 39
    Mississippi Highway 39 is a state highway in eastern Mississippi that runs north–south through several counties, connecting rural communities to larger regional routes and towns.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3a95d88190a3bd80d9471976c3 completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f129c045448190b3d189cdb8c0d2fd completed April 28, 2026, 9:42 p.m.
Created at: April 16, 2026, 8:32 p.m.