Triple

T22143249
Position Surface form Disambiguated ID Type / Status
Subject Pearl River County, Mississippi E547218 entity
Predicate hasMajorHighway P385 FINISHED
Object Mississippi Highway 26 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi Highway 26 | Statement: [Pearl River County, Mississippi, hasMajorHighway, Mississippi Highway 26]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 26
Context triple: [Pearl River County, Mississippi, hasMajorHighway, Mississippi Highway 26]
  • A. Mississippi Highway 28
    Mississippi Highway 28 is a state highway in Mississippi that runs east–west across the state, connecting several counties and communities in the south-central region.
  • B. Mississippi Highway 25
    Mississippi Highway 25 is a primary north–south state highway in Mississippi that connects several key cities and regions across the state.
  • C. Mississippi Highway 29
    Mississippi Highway 29 is a state highway in Mississippi that runs through several counties in the southeastern part of the state, connecting rural communities and serving as a regional north–south route.
  • D. Mississippi Highway 69
    Mississippi Highway 69 is a state highway in Mississippi that runs through the Columbus area in Lowndes County, connecting to the Alabama state line and serving as a regional route for local and through traffic.
  • E. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 26
Target entity description: Mississippi Highway 26 is an east–west state highway in southern Mississippi that connects several rural communities and towns, including areas within Pearl River County.
  • A. Mississippi Highway 28
    Mississippi Highway 28 is a state highway in Mississippi that runs east–west across the state, connecting several counties and communities in the south-central region.
  • B. Mississippi Highway 25
    Mississippi Highway 25 is a primary north–south state highway in Mississippi that connects several key cities and regions across the state.
  • C. Mississippi Highway 29
    Mississippi Highway 29 is a state highway in Mississippi that runs through several counties in the southeastern part of the state, connecting rural communities and serving as a regional north–south route.
  • D. Mississippi Highway 69
    Mississippi Highway 69 is a state highway in Mississippi that runs through the Columbus area in Lowndes County, connecting to the Alabama state line and serving as a regional route for local and through traffic.
  • E. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3a95d88190a3bd80d9471976c3 completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f129c045448190b3d189cdb8c0d2fd completed April 28, 2026, 9:42 p.m.
Created at: April 16, 2026, 8:32 p.m.