Triple
T22136552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Deen Dayal Upadhyaya Gram Jyoti Yojana |
E547044
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power distribution programme |
C30327
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power distribution programme Context triple: [Deen Dayal Upadhyaya Gram Jyoti Yojana, instanceOf, power distribution programme]
-
A.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
national grid system
A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
-
C.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
D.
energy hub
An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
-
E.
distribution modernization initiative
chosen
A distribution modernization initiative is a coordinated program to upgrade, digitize, and optimize distribution networks, processes, and technologies to improve reliability, efficiency, and customer service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e3a95d88190a3bd80d9471976c3 |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:32 p.m.