Triple

T22136552
Position Surface form Disambiguated ID Type / Status
Subject Deen Dayal Upadhyaya Gram Jyoti Yojana E547044 entity
Predicate instanceOf P0 FINISHED
Object power distribution programme C30327 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power distribution programme
Context triple: [Deen Dayal Upadhyaya Gram Jyoti Yojana, instanceOf, power distribution programme]
  • A. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • B. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • C. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • D. energy hub
    An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
  • E. distribution modernization initiative chosen
    A distribution modernization initiative is a coordinated program to upgrade, digitize, and optimize distribution networks, processes, and technologies to improve reliability, efficiency, and customer service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3a95d88190a3bd80d9471976c3 completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:32 p.m.