Triple

T22136550
Position Surface form Disambiguated ID Type / Status
Subject Deen Dayal Upadhyaya Gram Jyoti Yojana E547044 entity
Predicate instanceOf P0 FINISHED
Object rural electrification scheme C45844 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rural electrification scheme
Context triple: [Deen Dayal Upadhyaya Gram Jyoti Yojana, instanceOf, rural electrification scheme]
  • A. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • B. rural development fund
    A rural development fund is a financial mechanism that pools and allocates resources to support economic growth, infrastructure, and social services in rural areas, aiming to reduce regional disparities and improve quality of life.
  • C. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • D. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • E. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3a95d88190a3bd80d9471976c3 completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:32 p.m.