Triple

T22089991
Position Surface form Disambiguated ID Type / Status
Subject Carl and Cole E545887 entity
Predicate instanceOf P0 FINISHED
Object Muni Metro light rail stop C2851 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Muni Metro light rail stop
Context triple: [Carl and Cole, instanceOf, Muni Metro light rail stop]
  • A. light-rail station chosen
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • B. Pink Line station
    A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
  • C. San Francisco Municipal Railway facility
    A San Francisco Municipal Railway facility is a physical site used for the operation, maintenance, storage, and administration of Muni transit vehicles and related services within the San Francisco public transportation system.
  • D. group of light rail stations
    A group of light rail stations is a collection of geographically or operationally related stops along a light rail transit line or network, treated as a single unit for planning, analysis, or management purposes.
  • E. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e36d03c8190a83a1ba802b7231b completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:29 p.m.