Triple

T22087592
Position Surface form Disambiguated ID Type / Status
Subject Kali River E545823 entity
Predicate hasDam P8736 FINISHED
Object Supa Dam
Supa Dam is a major hydroelectric and irrigation dam built across the Kali River in Karnataka, India.
E1517668 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Supa Dam | Statement: [Kali River, hasDam, Supa Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Supa Dam
Context triple: [Kali River, hasDam, Supa Dam]
  • A. Nihuil Dam
    Nihuil Dam is a hydroelectric dam and popular recreational area located on the Atuel River in Mendoza Province, Argentina.
  • B. Brilliant Dam
    Brilliant Dam is a hydroelectric dam on the Kootenay River in southeastern British Columbia, Canada, known for generating power for the surrounding region.
  • C. Sautet Dam
    Sautet Dam is a hydroelectric dam on the Drac River in southeastern France, known for forming the Lac du Sautet reservoir amid dramatic Alpine scenery.
  • D. Atiamuri Dam
    Atiamuri Dam is a hydroelectric dam on New Zealand’s Waikato River that forms part of the country’s major Waikato River power generation scheme.
  • E. Seke Dam
    Seke Dam is a man-made reservoir in Zimbabwe that provides water storage and supports irrigation and other local uses along the Hunyani River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Supa Dam
Triple: [Kali River, hasDam, Supa Dam]
Generated description
Supa Dam is a major hydroelectric and irrigation dam built across the Kali River in Karnataka, India.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Supa Dam
Target entity description: Supa Dam is a major hydroelectric and irrigation dam built across the Kali River in Karnataka, India.
  • A. Nihuil Dam
    Nihuil Dam is a hydroelectric dam and popular recreational area located on the Atuel River in Mendoza Province, Argentina.
  • B. Brilliant Dam
    Brilliant Dam is a hydroelectric dam on the Kootenay River in southeastern British Columbia, Canada, known for generating power for the surrounding region.
  • C. Sautet Dam
    Sautet Dam is a hydroelectric dam on the Drac River in southeastern France, known for forming the Lac du Sautet reservoir amid dramatic Alpine scenery.
  • D. Atiamuri Dam
    Atiamuri Dam is a hydroelectric dam on New Zealand’s Waikato River that forms part of the country’s major Waikato River power generation scheme.
  • E. Seke Dam
    Seke Dam is a man-made reservoir in Zimbabwe that provides water storage and supports irrigation and other local uses along the Hunyani River.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e36d03c8190a83a1ba802b7231b completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f128e3a98481908a7b3dc3f2a90276 completed April 28, 2026, 9:38 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0a87962f50819091a8fbf791a2b05b completed May 18, 2026, 3:29 a.m.
NEDg Description generation batch_6a0a883da38881909b5379f784c89d65 completed May 18, 2026, 3:32 a.m.
NED2 Entity disambiguation (via description) batch_6a0a889757c88190adfc0b5e9ac13ec5 completed May 18, 2026, 3:33 a.m.
Created at: April 16, 2026, 8:29 p.m.