Triple

T22084407
Position Surface form Disambiguated ID Type / Status
Subject London River Services E545735 entity
Predicate instanceOf P0 FINISHED
Object transport organisation C4656 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport organisation
Context triple: [London River Services, instanceOf, transport organisation]
  • A. transportation organization chosen
    A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
  • B. transport ministry
    The transport ministry is a government department responsible for planning, regulating, and overseeing a nation’s transportation systems and infrastructure, including roads, railways, air, and maritime transport.
  • C. Regional Transport Office
    A Regional Transport Office is a government agency responsible for vehicle registration, driver licensing, enforcement of transport regulations, and maintenance of regional motor vehicle records.
  • D. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • E. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3523488190badd54b5d580c00d completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:29 p.m.