Triple

T22025121
Position Surface form Disambiguated ID Type / Status
Subject Turkish railway network E543939 entity
Predicate operator P179 FINISHED
Object TCDD NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TCDD | Statement: [Turkish railway network, operator, TCDD]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TCDD
Context triple: [Turkish railway network, operator, TCDD]
  • A. TCDD Teknik
    TCDD Teknik is a Turkish railway engineering and technical services company that operates as a subsidiary of the national rail operator.
  • B. Turkish State Railways chosen
    Turkish State Railways is Turkey’s national railway company, responsible for operating and maintaining the country’s rail transport network, including high-speed train services.
  • C. TCDD HT10000
    TCDD HT10000 is a planned next-generation high-speed electric multiple unit designed to operate on Turkey’s expanding high-speed rail network at very high speeds and with increased passenger capacity.
  • D. TCDD HT80000
    TCDD HT80000 is a class of high-speed electric multiple unit trains operated by the Turkish State Railways for passenger services on Turkey’s high-speed rail network.
  • E. TCDD HT65000
    TCDD HT65000 is a series of high-speed electric multiple unit trains operated by the Turkish State Railways for passenger services on Turkey’s modern high-speed rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2e8ea4819084210fe06d3a1b8d completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f127ca45a08190b2d5d3a8eb37cb4b completed April 28, 2026, 9:34 p.m.
Created at: April 16, 2026, 8:23 p.m.