Triple
T22015479
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alicurá Dam |
E543695
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Limay River hydroelectric complex |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Limay River hydroelectric complex | Statement: [Alicurá Dam, partOf, Limay River hydroelectric complex]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Limay River hydroelectric complex Context triple: [Alicurá Dam, partOf, Limay River hydroelectric complex]
-
A.
Limay River hydroelectric cascade
chosen
The Limay River hydroelectric cascade is a series of large dams and power stations along Argentina’s Limay River that together form a major source of hydroelectric generation for the country.
-
B.
Peligre hydroelectric plant
The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
-
C.
Uri-II Hydroelectric Station
Uri-II Hydroelectric Station is a run-of-the-river hydroelectric power plant in Jammu and Kashmir, India, built on the Jhelum River to generate electricity as part of the larger Uri Hydroelectric Project.
-
D.
Turano-Salto hydroelectric system
The Turano-Salto hydroelectric system is a major Italian power complex that harnesses the waters of the Turano and Salto lakes and rivers to generate renewable electricity.
-
E.
Karuma Hydropower Station
Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2db934819095556760c7d85e4d |
completed | April 16, 2026, 5:36 p.m. |
| NER | Named-entity recognition | batch_69f127a774548190bcd98dc28f2d2c5f |
completed | April 28, 2026, 9:33 p.m. |
Created at: April 16, 2026, 8:22 p.m.