Triple
T22015462
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alicurá Dam |
E543695
|
entity |
| Predicate | formsReservoir |
P11309
|
FINISHED |
| Object | Alicurá Reservoir |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alicurá Reservoir | Statement: [Alicurá Dam, formsReservoir, Alicurá Reservoir]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Alicurá Reservoir Context triple: [Alicurá Dam, formsReservoir, Alicurá Reservoir]
-
A.
Alcántara Reservoir
Alcántara Reservoir is a large artificial lake in western Spain, created by damming the Tagus River system and used primarily for hydroelectric power generation, irrigation, and water supply.
-
B.
Burguillo Reservoir
Burguillo Reservoir is a major artificial lake and dam in central Spain, known for regulating water from the Alberche River and serving as a popular site for recreation and hydroelectric power.
-
C.
Pilarcitos Reservoir
Pilarcitos Reservoir is a key drinking water storage reservoir on the San Francisco Peninsula that helps supply water to the San Francisco Bay Area.
-
D.
El Villar Reservoir
El Villar Reservoir is a historic dam and water reservoir on the Lozoya River in Spain, known for being one of the earliest large concrete arch dams in the country.
-
E.
Ullíbarri-Gamboa Reservoir
Ullíbarri-Gamboa Reservoir is a large artificial lake in Álava, Spain, known for supplying drinking water to Vitoria-Gasteiz and Bilbao and for its popular recreational activities and natural surroundings.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Alicurá Reservoir Target entity description: Alicurá Reservoir is a large artificial lake in Argentina’s Neuquén and Río Negro provinces, created for hydroelectric power generation and water regulation.
-
A.
Alcántara Reservoir
Alcántara Reservoir is a large artificial lake in western Spain, created by damming the Tagus River system and used primarily for hydroelectric power generation, irrigation, and water supply.
-
B.
Burguillo Reservoir
Burguillo Reservoir is a major artificial lake and dam in central Spain, known for regulating water from the Alberche River and serving as a popular site for recreation and hydroelectric power.
-
C.
Pilarcitos Reservoir
Pilarcitos Reservoir is a key drinking water storage reservoir on the San Francisco Peninsula that helps supply water to the San Francisco Bay Area.
-
D.
El Villar Reservoir
El Villar Reservoir is a historic dam and water reservoir on the Lozoya River in Spain, known for being one of the earliest large concrete arch dams in the country.
-
E.
Ullíbarri-Gamboa Reservoir
Ullíbarri-Gamboa Reservoir is a large artificial lake in Álava, Spain, known for supplying drinking water to Vitoria-Gasteiz and Bilbao and for its popular recreational activities and natural surroundings.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2db934819095556760c7d85e4d |
completed | April 16, 2026, 5:36 p.m. |
| NER | Named-entity recognition | batch_69f127a774548190bcd98dc28f2d2c5f |
completed | April 28, 2026, 9:33 p.m. |
Created at: April 16, 2026, 8:22 p.m.