Triple

T21997592
Position Surface form Disambiguated ID Type / Status
Subject Indian Railways Service of Engineers E543245 entity
Predicate instanceOf P0 FINISHED
Object engineering service C45639 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering service
Context triple: [Indian Railways Service of Engineers, instanceOf, engineering service]
  • A. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • B. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • C. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • D. engineering process
    An engineering process is a structured, iterative sequence of activities and decisions used to design, develop, test, and maintain systems or products to meet specified requirements efficiently and reliably.
  • E. engineering profession
    The engineering profession is a field in which individuals apply scientific, mathematical, and technical knowledge to design, develop, and optimize systems, structures, and technologies that solve practical problems and improve society.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2c814c8190837d072789000486 completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:19 p.m.