Triple
T21979325
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tullamore |
E542794
|
entity |
| Predicate | hasRoadConnection |
P385
|
FINISHED |
| Object | N80 road |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N80 road | Statement: [Tullamore, hasRoadConnection, N80 road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: N80 road Context triple: [Tullamore, hasRoadConnection, N80 road]
-
A.
N80 road
chosen
The N80 road is a national secondary route in Ireland that runs across the midlands, linking several towns between the southeast and the central region.
-
B.
N8 road
The N8 road is a regional route in Belgium that connects the coastal city of Veurne with inland towns and cities, serving as an important link between West Flanders and the interior.
-
C.
N8 road
The N8 road is a major national primary route in Ireland that historically connected Dublin to Cork, passing through several counties including County Laois.
-
D.
N81 road
The N81 road is a national secondary route in Ireland that runs southwest from Dublin through towns such as Blessington toward Tullow.
-
E.
N85 road
The N85 road is a national secondary route in County Clare, Ireland, linking the town of Ennis to the Cliffs of Moher area and the wider west Clare region.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c48070988190909db97667b9a0ac |
completed | April 16, 2026, 11:14 a.m. |
| NER | Named-entity recognition | batch_69f1248bdd88819098bfeca550608f14 |
completed | April 28, 2026, 9:20 p.m. |
Created at: April 16, 2026, 8:03 p.m.