Triple

T21959635
Position Surface form Disambiguated ID Type / Status
Subject A25 motorway (Portugal) E542288 entity
Predicate isPartOfCorridor P35 FINISHED
Object Aveiro–Vilar Formoso international corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Aveiro–Vilar Formoso international corridor | Statement: [A25 motorway (Portugal), isPartOfCorridor, Aveiro–Vilar Formoso international corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Aveiro–Vilar Formoso international corridor
Context triple: [A25 motorway (Portugal), isPartOfCorridor, Aveiro–Vilar Formoso international corridor]
  • A. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • B. Linha do Vouga corridor
    The Linha do Vouga corridor is a narrow-gauge railway line in Portugal that connects several interior towns in the Vouga River region and is served by regional passenger trains.
  • C. Lisbon–Madrid road corridor
    The Lisbon–Madrid road corridor is a major transnational highway route linking Portugal’s capital Lisbon with Spain’s capital Madrid, facilitating significant passenger and freight transport between the two Iberian countries.
  • D. Lisbon–Covilhã
    Lisbon–Covilhã is a long-distance Intercidades rail service in Portugal connecting the capital city Lisbon with the inland city of Covilhã across the country’s central region.
  • E. Linha de Setúbal
    Linha de Setúbal is a Portuguese railway line serving the Setúbal region, connecting it to the national rail network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Aveiro–Vilar Formoso international corridor
Target entity description: The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
  • A. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • B. Linha do Vouga corridor
    The Linha do Vouga corridor is a narrow-gauge railway line in Portugal that connects several interior towns in the Vouga River region and is served by regional passenger trains.
  • C. Lisbon–Madrid road corridor
    The Lisbon–Madrid road corridor is a major transnational highway route linking Portugal’s capital Lisbon with Spain’s capital Madrid, facilitating significant passenger and freight transport between the two Iberian countries.
  • D. Lisbon–Covilhã
    Lisbon–Covilhã is a long-distance Intercidades rail service in Portugal connecting the capital city Lisbon with the inland city of Covilhã across the country’s central region.
  • E. Linha de Setúbal
    Linha de Setúbal is a Portuguese railway line serving the Setúbal region, connecting it to the national rail network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47fab1081908dc74a6545dbb051 completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f12454a290819094d4b56547816e3f completed April 28, 2026, 9:19 p.m.
Created at: April 16, 2026, 8 p.m.