Triple
T21947753
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agbor |
E541976
|
entity |
| Predicate | locatedOn |
P40
|
FINISHED |
| Object | Benin–Asaba highway |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Benin–Asaba highway | Statement: [Agbor, locatedOn, Benin–Asaba highway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Benin–Asaba highway Context triple: [Agbor, locatedOn, Benin–Asaba highway]
-
A.
Benin–Auchi highway
The Benin–Auchi highway is a major roadway in Edo State, Nigeria, connecting the city of Benin with Auchi and serving several towns along its route.
-
B.
Warri–Benin City Highway
The Warri–Benin City Highway is a major roadway in southern Nigeria that connects the oil-rich city of Warri with the historic city of Benin, serving as a key route for regional transport and commerce.
-
C.
Monrovia-Gbarnga highway
The Monrovia–Gbarnga Highway is a major arterial road in Liberia that links the capital region with the inland city of Gbarnga, serving as a key route for domestic travel and commerce.
-
D.
Trans–West African Coastal Highway
The Trans–West African Coastal Highway is a major international road network that links numerous coastal countries of West Africa, facilitating regional trade and transportation.
-
E.
Abuja–Lokoja highway corridor
The Abuja–Lokoja highway corridor is a major Nigerian transport route linking the federal capital region with the southern parts of the country and serving as a key artery for passenger and freight movement.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Benin–Asaba highway Target entity description: The Benin–Asaba highway is a major roadway in southern Nigeria that connects the city of Benin with Asaba and passes through several towns including Agbor.
-
A.
Benin–Auchi highway
The Benin–Auchi highway is a major roadway in Edo State, Nigeria, connecting the city of Benin with Auchi and serving several towns along its route.
-
B.
Warri–Benin City Highway
The Warri–Benin City Highway is a major roadway in southern Nigeria that connects the oil-rich city of Warri with the historic city of Benin, serving as a key route for regional transport and commerce.
-
C.
Monrovia-Gbarnga highway
The Monrovia–Gbarnga Highway is a major arterial road in Liberia that links the capital region with the inland city of Gbarnga, serving as a key route for domestic travel and commerce.
-
D.
Trans–West African Coastal Highway
The Trans–West African Coastal Highway is a major international road network that links numerous coastal countries of West Africa, facilitating regional trade and transportation.
-
E.
Abuja–Lokoja highway corridor
The Abuja–Lokoja highway corridor is a major Nigerian transport route linking the federal capital region with the southern parts of the country and serving as a key artery for passenger and freight movement.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47ef0e48190a50e1bcc43f4b3fd |
completed | April 16, 2026, 11:14 a.m. |
| NER | Named-entity recognition | batch_69f1243a2f788190bd4625fa79888696 |
completed | April 28, 2026, 9:18 p.m. |
Created at: April 16, 2026, 7:57 p.m.