Triple
T21922895
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | United States Capitol Subway System |
E541364
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | intra-campus rail transit system |
C912
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: intra-campus rail transit system Context triple: [United States Capitol Subway System, instanceOf, intra-campus rail transit system]
-
A.
rail transit
chosen
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
-
B.
continuous transport system
A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
underground rail corridor
An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
-
E.
commuter rail infrastructure
Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47d74488190a15119108794a307 |
completed | April 16, 2026, 11:14 a.m. |
Created at: April 16, 2026, 7:45 p.m.