Triple

T2192020
Position Surface form Disambiguated ID Type / Status
Subject The Process E49882 entity
Predicate instanceOf P0 FINISHED
Object rebuilding strategy C7550 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rebuilding strategy
Context triple: [The Process, instanceOf, rebuilding strategy]
  • A. post–World War II reconstruction program
    A post–World War II reconstruction program is a coordinated set of policies, financial aid, and institutional reforms designed to rebuild war-torn economies, infrastructure, and governance structures while promoting long-term stability and growth.
  • B. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • C. long-term plan chosen
    A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
  • D. building complex
    A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
  • E. building section
    A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aaba3c48190b351cab9b26989ff completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:46 p.m.