Triple

T2190843
Position Surface form Disambiguated ID Type / Status
Subject RAS TAB E49856 entity
Predicate instanceOf P0 FINISHED
Object technical activities board C4031 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technical activities board
Context triple: [RAS TAB, instanceOf, technical activities board]
  • A. technical code
    Technical code is a structured set of machine-readable instructions, written in a specific programming language, that implements precise computational logic and system behavior according to defined technical requirements.
  • B. technology blog
    A technology blog is an online publication that regularly shares news, reviews, tutorials, and opinions about current and emerging technologies for a tech-interested audience.
  • C. community hub
    A community hub is a central place, physical or virtual, where people gather to connect, share resources, collaborate, and participate in activities that support collective well-being and local engagement.
  • D. board committee chosen
    A board committee is a small, specialized group of board members delegated specific responsibilities to support the board’s governance, oversight, and decision-making functions.
  • E. local board
    A local board is a governing or advisory body composed of community representatives responsible for making decisions, setting policies, or providing oversight within a specific geographic area or jurisdiction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aaba3c48190b351cab9b26989ff completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:46 p.m.