Triple

T2189037
Position Surface form Disambiguated ID Type / Status
Subject Cape Canaveral LC-41 E49818 entity
Predicate instanceOf P0 FINISHED
Object launch complex C5843 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: launch complex
Context triple: [Cape Canaveral LC-41, instanceOf, launch complex]
  • A. building complex
    A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
  • B. launch failure
    A launch failure is an event in which a planned rocket or spacecraft launch does not achieve its intended mission objectives due to technical, environmental, or operational issues.
  • C. space launch facility chosen
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • D. launch service provider
    A launch service provider is an organization that offers end-to-end services for placing payloads such as satellites or spacecraft into space using launch vehicles and associated ground infrastructure.
  • E. NASA field center precursor
    A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aaba3c48190b351cab9b26989ff completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:46 p.m.