Triple

T2188069
Position Surface form Disambiguated ID Type / Status
Subject Columbia South Shore Well Field E49796 entity
Predicate instanceOf P0 FINISHED
Object drinking water supply system C3665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: drinking water supply system
Context triple: [Columbia South Shore Well Field, instanceOf, drinking water supply system]
  • A. water supply system chosen
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • B. drinking water infrastructure
    Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
  • C. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • D. water source
    A water source is any natural or artificial origin from which water is obtained for ecological, domestic, agricultural, or industrial use.
  • E. water management structure
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aaba3c48190b351cab9b26989ff completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:45 p.m.