Triple

T218651
Position Surface form Disambiguated ID Type / Status
Subject Mode Wheel Lock E4164 entity
Predicate instanceOf P0 FINISHED
Object infrastructure C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure
Context triple: [Mode Wheel Lock, instanceOf, infrastructure]
  • A. educational infrastructure
    Educational infrastructure encompasses the physical facilities, technological systems, human resources, and organizational structures that support the delivery, management, and improvement of learning and teaching.
  • B. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • C. highway bridge
    A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
  • D. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • E. network architecture
    A network architecture is the structured design and organization of hardware, software, protocols, and communication paths that define how data flows and services are delivered within a computer network.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2573508588190b522c2476d91acfe completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:53 a.m.