Triple
T21852590
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Electricity Infrastructure Operations Center |
E539540
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electric power systems laboratory |
C30176
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electric power systems laboratory Context triple: [Electricity Infrastructure Operations Center, instanceOf, electric power systems laboratory]
-
A.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
electrical engineering department
An electrical engineering department is an academic or organizational unit focused on the study, research, and application of electricity, electronics, and electromagnetism in designing and improving electrical systems and technologies.
-
C.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
D.
electronics research laboratory
chosen
An electronics research laboratory is a specialized facility equipped with advanced instruments and tools where scientists and engineers design, prototype, and experimentally investigate electronic components, circuits, and systems.
-
E.
energy storage system
An energy storage system is a device or group of devices that capture, store, and release energy for later use to improve reliability, efficiency, and flexibility of power supply.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47829648190bbe2d1d7033768ec |
completed | April 16, 2026, 11:14 a.m. |
Created at: April 16, 2026, 6:56 p.m.