Triple

T2184846
Position Surface form Disambiguated ID Type / Status
Subject Christus Spohn Shoreline Hospital projects E49127 entity
Predicate instanceOf P0 FINISHED
Object capital improvement program C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: capital improvement program
Context triple: [Christus Spohn Shoreline Hospital projects, instanceOf, capital improvement program]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. multiannual funding programme
    A multiannual funding programme is a structured financial initiative that allocates resources over several years to support specified objectives, projects, or policy priorities within a defined framework and timeline.
  • D. particle accelerator upgrade project
    A particle accelerator upgrade project is a coordinated engineering and scientific effort to enhance an existing accelerator’s performance, capabilities, or reliability through targeted hardware, software, and infrastructure improvements.
  • E. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa72d348190a9544bb5b8a4e71d completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:45 p.m.