Triple

T21844413
Position Surface form Disambiguated ID Type / Status
Subject Khwadāy-Nāmag E539337 entity
Predicate approximateCompletionBefore P53319 FINISHED
Object 7th century CE LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 7th century CE | Statement: [Khwadāy-Nāmag, approximateCompletionBefore, 7th century CE]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: approximateCompletionBefore
Context triple: [Khwadāy-Nāmag, approximateCompletionBefore, 7th century CE]
  • A. completedBefore
    Indicates that one event or action was fully completed prior to the start or completion of another specified event or action.
  • B. approximateCompletionEra chosen
    Indicates the general historical period or time range during which something was completed, without specifying an exact date.
  • C. completionOf
    Indicates that one entity represents the finished state, fulfillment, or successful conclusion of another entity, process, or requirement.
  • D. hasApproximateEnd
    Indicates that an entity’s end point, time, or boundary is known only approximately rather than precisely.
  • E. mayBeCompleted
    Indicates that an action, process, or task has the potential to be completed, but its completion is not guaranteed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c476c3c88190a92d08ebb59a128a completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f0bd5248f08190ba208512eafbe7ad completed April 28, 2026, 1:59 p.m.
PD Predicate disambiguation batch_69e6be8c14748190bdcc44a14d50bea4 completed April 21, 2026, 12:02 a.m.
Created at: April 16, 2026, 6:55 p.m.