Triple

T21843664
Position Surface form Disambiguated ID Type / Status
Subject Homer Bone E539318 entity
Predicate supported P1853 FINISHED
Object Bonneville Dam power development NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bonneville Dam power development | Statement: [Homer Bone, supported, Bonneville Dam power development]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bonneville Dam power development
Context triple: [Homer Bone, supported, Bonneville Dam power development]
  • A. Bonneville Dam chosen
    Bonneville Dam is a major hydroelectric and navigation dam on the Columbia River in the Pacific Northwest, known for power generation, fish ladders, and its role in regional river management.
  • B. Boulder Canyon Project
    The Boulder Canyon Project was a major U.S. federal public works initiative of the early 20th century that authorized and funded the construction of Hoover Dam and related infrastructure on the Colorado River for flood control, irrigation, and hydroelectric power.
  • C. Klamath River Hydroelectric Project
    The Klamath River Hydroelectric Project is a system of dams and related facilities on the Klamath River in Oregon and California that historically generated hydroelectric power and has become a focal point of major river restoration and dam removal efforts.
  • D. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • E. Hells Canyon Project
    The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c476c3c88190a92d08ebb59a128a completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f0bd5248f08190ba208512eafbe7ad completed April 28, 2026, 1:59 p.m.
Created at: April 16, 2026, 6:55 p.m.