Triple

T21833063
Position Surface form Disambiguated ID Type / Status
Subject Val d’Anniviers E539046 entity
Predicate hasDam P8736 FINISHED
Object Moiry Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Moiry Dam | Statement: [Val d’Anniviers, hasDam, Moiry Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Moiry Dam
Context triple: [Val d’Anniviers, hasDam, Moiry Dam]
  • A. Rhodhiss Dam
    Rhodhiss Dam is a hydroelectric dam on the Catawba River in North Carolina that forms Lake Rhodhiss and helps provide power and water supply to the surrounding region.
  • B. Aviemore Dam
    Aviemore Dam is a major hydroelectric dam in New Zealand’s South Island, forming Lake Aviemore as part of the Waitaki River power scheme.
  • C. Pitlochry Dam
    Pitlochry Dam is a mid-20th-century hydroelectric dam on the River Tummel in Scotland, noted for its power station and popular salmon ladder attraction.
  • D. Keenleyside Dam
    Keenleyside Dam is a major hydroelectric and flood-control dam on the Columbia River in British Columbia, Canada, forming part of the region’s large transboundary water management system.
  • E. Spavinaw Dam
    Spavinaw Dam is an early 20th-century concrete gravity dam in Oklahoma built to create Spavinaw Lake as a primary water supply source for the city of Tulsa.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Moiry Dam
Target entity description: Moiry Dam is a large arch dam in the Swiss Alps that creates Lac de Moiry, serving hydroelectric power generation and water storage in the Val d’Anniviers region.
  • A. Rhodhiss Dam
    Rhodhiss Dam is a hydroelectric dam on the Catawba River in North Carolina that forms Lake Rhodhiss and helps provide power and water supply to the surrounding region.
  • B. Aviemore Dam
    Aviemore Dam is a major hydroelectric dam in New Zealand’s South Island, forming Lake Aviemore as part of the Waitaki River power scheme.
  • C. Pitlochry Dam
    Pitlochry Dam is a mid-20th-century hydroelectric dam on the River Tummel in Scotland, noted for its power station and popular salmon ladder attraction.
  • D. Keenleyside Dam
    Keenleyside Dam is a major hydroelectric and flood-control dam on the Columbia River in British Columbia, Canada, forming part of the region’s large transboundary water management system.
  • E. Spavinaw Dam
    Spavinaw Dam is an early 20th-century concrete gravity dam in Oklahoma built to create Spavinaw Lake as a primary water supply source for the city of Tulsa.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c475cda88190987d08f23caebdc1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f0a7a4d2d0819088ded045caeab52d completed April 28, 2026, 12:27 p.m.
Created at: April 16, 2026, 6:55 p.m.