Triple
T21831212
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beeching cuts |
E538997
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway closure programme |
C45380
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway closure programme Context triple: [Beeching cuts, instanceOf, railway closure programme]
-
A.
railway modernisation project
A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
-
B.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
C.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
D.
railway portal
A railway portal is a structural entrance or gateway, typically at the mouth of a tunnel or major rail facility, that marks the transition between open track and enclosed or specialized railway infrastructure.
-
E.
rail
A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c475cda88190987d08f23caebdc1 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:55 p.m.