Triple

T21782194
Position Surface form Disambiguated ID Type / Status
Subject ProSlide Technology E537739 entity
Predicate instanceOf P0 FINISHED
Object water slide designer C23374 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water slide designer
Context triple: [ProSlide Technology, instanceOf, water slide designer]
  • A. water ride
    A water ride is an amusement attraction that uses water-filled channels, flumes, or pools to move riders through themed environments, often featuring splashes, drops, and soaking elements for entertainment.
  • B. water-themed attraction
    A water-themed attraction is a recreational venue or feature centered around water-based activities, environments, or spectacles designed for entertainment, relaxation, or adventure.
  • C. theme park designer chosen
    A theme park designer is a professional who conceptualizes, plans, and creates immersive, story-driven environments and attractions that balance guest experience, safety, and operational efficiency.
  • D. outdoor water park
    An outdoor water park is a recreational facility featuring open-air water-based attractions such as pools, slides, splash pads, and lazy rivers designed for seasonal, weather-dependent fun and relaxation.
  • E. indoor water park
    An indoor water park is a climate-controlled recreational facility featuring water-based attractions such as pools, slides, and play areas designed for year-round use regardless of outdoor weather conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47198f881908cb0d237266c10e9 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:52 p.m.