Triple
T21782193
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ProSlide Technology |
E537739
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water ride manufacturer |
C7337
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water ride manufacturer Context triple: [ProSlide Technology, instanceOf, water ride manufacturer]
-
A.
amusement ride manufacturer
chosen
An amusement ride manufacturer is a company or entity that designs, engineers, constructs, and often installs mechanical attractions such as roller coasters, carousels, and other rides for amusement parks and entertainment venues.
-
B.
water ride
A water ride is an amusement attraction that uses water-filled channels, flumes, or pools to move riders through themed environments, often featuring splashes, drops, and soaking elements for entertainment.
-
C.
water park brand
A water park brand is a distinctive identity that encompasses the visual style, messaging, and guest experience strategy used to differentiate a water park and build emotional connection with its target audience.
-
D.
water-themed attraction
A water-themed attraction is a recreational venue or feature centered around water-based activities, environments, or spectacles designed for entertainment, relaxation, or adventure.
-
E.
outdoor water park
An outdoor water park is a recreational facility featuring open-air water-based attractions such as pools, slides, splash pads, and lazy rivers designed for seasonal, weather-dependent fun and relaxation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47198f881908cb0d237266c10e9 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:52 p.m.