Triple
T21778595
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Borrowdale Volcanic Group |
E537646
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | volcanic rock sequence |
C45275
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: volcanic rock sequence Context triple: [Borrowdale Volcanic Group, instanceOf, volcanic rock sequence]
-
A.
volcanic complex
A volcanic complex is a geologic feature consisting of multiple related volcanic centers and associated deposits that have formed over an extended period of eruptive activity.
-
B.
volcanic landscape
A volcanic landscape is a terrain shaped by past or present volcanic activity, featuring elements such as craters, lava flows, ash fields, and volcanic cones.
-
C.
ignimbrite
Ignimbrite is a type of volcanic rock formed from the rapid deposition and welding of hot pyroclastic flows, primarily composed of ash, pumice, and rock fragments.
-
D.
ignimbrite-filled valley
An ignimbrite-filled valley is a landscape depression that has been infilled and partially reshaped by thick deposits of welded volcanic ash-flow tuffs from explosive eruptions.
-
E.
volcanic arc
A volcanic arc is a curved chain of volcanoes that forms above a subducting tectonic plate, typically parallel to an oceanic trench, where magma generated by subduction rises to the surface.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c470759c819094a215757113562b |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:52 p.m.