Triple

T21768535
Position Surface form Disambiguated ID Type / Status
Subject Pick-Sloan Missouri Basin Program E537360 entity
Predicate namedAfter P63 FINISHED
Object Lewis A. Pick
Lewis A. Pick was a U.S. Army Corps of Engineers officer and civil engineer best known for co-authoring the Pick-Sloan Missouri Basin Program, a major mid-20th-century water resources development plan for the Missouri River Basin.
E1632226 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lewis A. Pick | Statement: [Pick-Sloan Missouri Basin Program, namedAfter, Lewis A. Pick]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Lewis A. Pick
Triple: [Pick-Sloan Missouri Basin Program, namedAfter, Lewis A. Pick]
Generated description
Lewis A. Pick was a U.S. Army Corps of Engineers officer and civil engineer best known for co-authoring the Pick-Sloan Missouri Basin Program, a major mid-20th-century water resources development plan for the Missouri River Basin.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46f5d1c8190bf830409e98464e5 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f031ac10808190837a0f69c4f8a02d completed April 28, 2026, 4:03 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0fd6205f1881908e9e4696e29d1ea6 completed May 22, 2026, 4:05 a.m.
NEDg Description generation batch_6a0fd76f32f081908122da8e6064e205 completed May 22, 2026, 4:11 a.m.
NED2 Entity disambiguation (via description) batch_6a0fd8e5ce10819096e6cdff28c1b3a2 completed May 22, 2026, 4:17 a.m.
Created at: April 16, 2026, 6:51 p.m.