Triple

T21768518
Position Surface form Disambiguated ID Type / Status
Subject Pick-Sloan Missouri Basin Program E537360 entity
Predicate instanceOf P0 FINISHED
Object water resources development program C3134 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water resources development program
Context triple: [Pick-Sloan Missouri Basin Program, instanceOf, water resources development program]
  • A. water resources programme chosen
    A water resources programme is an organized set of policies, projects, and management activities aimed at sustainably developing, allocating, protecting, and monitoring water resources to meet environmental, social, and economic needs.
  • B. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. water resources development act
    The Water Resources Development Act is a recurring United States federal law that authorizes and guides the planning, construction, and maintenance of water resources projects such as navigation, flood control, and ecosystem restoration, primarily carried out by the U.S. Army Corps of Engineers.
  • D. drinking water infrastructure financing program
    A drinking water infrastructure financing program is a structured funding mechanism that provides loans, grants, or other financial assistance to plan, build, upgrade, and maintain public drinking water systems to ensure safe, reliable, and compliant water service.
  • E. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46f5d1c8190bf830409e98464e5 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:51 p.m.