Triple

T21768427
Position Surface form Disambiguated ID Type / Status
Subject Missouri River reservoir system E537357 entity
Predicate governedBy P46 FINISHED
Object Missouri River Master Manual
The Missouri River Master Manual is the U.S. Army Corps of Engineers’ primary policy and operations guide that dictates how the Missouri River’s reservoir system is managed for purposes such as flood control, navigation, hydropower, irrigation, recreation, and environmental protection.
E537357 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri River Master Manual | Statement: [Missouri River reservoir system, governedBy, Missouri River Master Manual]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Missouri River Master Manual
Context triple: [Missouri River reservoir system, governedBy, Missouri River Master Manual]
  • A. Missouri Soil and Water Conservation Program
    The Missouri Soil and Water Conservation Program is a state initiative that supports and funds efforts to prevent soil erosion, protect water quality, and promote sustainable land management practices across Missouri.
  • B. Missouri River reservoir system
    The Missouri River reservoir system is a network of large dams and reservoirs along the Missouri River designed primarily for flood control, hydroelectric power generation, irrigation, navigation, and recreation.
  • C. Missouri Dam and Reservoir Safety Program
    The Missouri Dam and Reservoir Safety Program is a state regulatory initiative that oversees the design, construction, operation, and inspection of dams and reservoirs in Missouri to protect public safety and property.
  • D. Pick-Sloan Missouri Basin Program
    The Pick-Sloan Missouri Basin Program is a major mid-20th-century U.S. federal water resources development initiative that created a system of dams, reservoirs, and related infrastructure along the Missouri River for flood control, irrigation, hydropower, and navigation.
  • E. Mississippi River Commission
    The Mississippi River Commission is a U.S. federal agency responsible for overseeing navigation, flood control, and related water resource management along the Mississippi River and its tributaries.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Missouri River Master Manual
Triple: [Missouri River reservoir system, governedBy, Missouri River Master Manual]
Generated description
The Missouri River Master Manual is the U.S. Army Corps of Engineers’ primary policy and operations guide that dictates how the Missouri River’s reservoir system is managed for purposes such as flood control, navigation, hydropower, irrigation, recreation, and environmental protection.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Missouri River Master Manual
Target entity description: The Missouri River Master Manual is the U.S. Army Corps of Engineers’ primary policy and operations guide that dictates how the Missouri River’s reservoir system is managed for purposes such as flood control, navigation, hydropower, irrigation, recreation, and environmental protection.
  • A. Missouri Soil and Water Conservation Program
    The Missouri Soil and Water Conservation Program is a state initiative that supports and funds efforts to prevent soil erosion, protect water quality, and promote sustainable land management practices across Missouri.
  • B. Missouri River reservoir system chosen
    The Missouri River reservoir system is a network of large dams and reservoirs along the Missouri River designed primarily for flood control, hydroelectric power generation, irrigation, navigation, and recreation.
  • C. Missouri Dam and Reservoir Safety Program
    The Missouri Dam and Reservoir Safety Program is a state regulatory initiative that oversees the design, construction, operation, and inspection of dams and reservoirs in Missouri to protect public safety and property.
  • D. Pick-Sloan Missouri Basin Program
    The Pick-Sloan Missouri Basin Program is a major mid-20th-century U.S. federal water resources development initiative that created a system of dams, reservoirs, and related infrastructure along the Missouri River for flood control, irrigation, hydropower, and navigation.
  • E. Mississippi River Commission
    The Mississippi River Commission is a U.S. federal agency responsible for overseeing navigation, flood control, and related water resource management along the Mississippi River and its tributaries.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46f5d1c8190bf830409e98464e5 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f031ac10808190837a0f69c4f8a02d completed April 28, 2026, 4:03 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0a367bbd008190b374213331527287 completed May 17, 2026, 9:43 p.m.
NEDg Description generation batch_6a0a373aca708190aae867f78c87b956 completed May 17, 2026, 9:46 p.m.
NED2 Entity disambiguation (via description) batch_6a0a37e0bed48190b0319d62eaff5d1e completed May 17, 2026, 9:49 p.m.
Created at: April 16, 2026, 6:51 p.m.