Triple

T217532
Position Surface form Disambiguated ID Type / Status
Subject Paso de San Francisco E4139 entity
Predicate instanceOf P0 FINISHED
Object international border crossing C3197 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: international border crossing
Context triple: [Paso de San Francisco, instanceOf, international border crossing]
  • A. international-free internal border
    An international-free internal border is a boundary between two or more countries within which people, goods, and services can move without routine border checks, controls, or significant legal restrictions.
  • B. border defense system
    A border defense system is an integrated network of physical barriers, surveillance technologies, personnel, and response protocols designed to monitor, control, and protect a nation's boundaries from unauthorized crossings and external threats.
  • C. transatlantic migration
    Transatlantic migration is the large-scale movement of people across the Atlantic Ocean, historically and contemporarily, driven by economic, political, social, and environmental factors that reshape societies on both sides.
  • D. international airport
    An international airport is a large, complex transportation hub that facilitates the arrival, departure, and transfer of passengers and cargo between countries through scheduled and chartered flights, customs, immigration, and related services.
  • E. international agreement
    An international agreement is a formal, negotiated arrangement between two or more sovereign states or international organizations that creates binding obligations under international law.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2573508588190b522c2476d91acfe completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:53 a.m.