Triple

T21750037
Position Surface form Disambiguated ID Type / Status
Subject Marilao, Bulacan E536889 entity
Predicate hasRiver P165 FINISHED
Object Marilao River NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Marilao River | Statement: [Marilao, Bulacan, hasRiver, Marilao River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Marilao River
Context triple: [Marilao, Bulacan, hasRiver, Marilao River]
  • A. Marilao River chosen
    Marilao River is a waterway in the province of Bulacan, Philippines, known for flowing through the municipality of Marilao and for its severe pollution issues.
  • B. Tarlac River
    Tarlac River is a significant river in the Philippine province of Tarlac that drains agricultural plains before joining the larger Agno River system.
  • C. Maragondon River
    Maragondon River is a waterway in the municipality of Maragondon in Cavite, Philippines, known for its role in local agriculture, ecology, and small-scale tourism.
  • D. Laoag River
    Laoag River is a major waterway in Ilocos Norte, Philippines, flowing through the city of Laoag and playing an important role in local agriculture and settlement.
  • E. Bacayao River
    Bacayao River is a waterway in Dagupan City, Pangasinan, Philippines, that forms part of the city’s river network and supports local fishing and transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46eab808190b848242d63a17c47 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f01a79fb74819098a247c4f31598a8 completed April 28, 2026, 2:24 a.m.
Created at: April 16, 2026, 6:50 p.m.