Triple

T2174518
Position Surface form Disambiguated ID Type / Status
Subject European Employment Strategy E48496 entity
Predicate instanceOf P0 FINISHED
Object labour market coordination mechanism C7871 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: labour market coordination mechanism
Context triple: [European Employment Strategy, instanceOf, labour market coordination mechanism]
  • A. occupation currency
    Occupation currency is a form of money introduced and controlled by a military or political occupying power for use within the territories it administers.
  • B. labour movement
    The labour movement is a collective social and political effort by workers and their organizations to improve wages, working conditions, and rights through solidarity, negotiation, and activism.
  • C. labor union
    A labor union is an organized association of workers formed to collectively negotiate with employers over wages, benefits, working conditions, and workplace rights.
  • D. ILO instrument
    An ILO instrument is a formal legal document—such as a convention, recommendation, or protocol—adopted by the International Labour Organization to set international labor standards and guide member states’ labor policies and practices.
  • E. organ of the International Labour Organization
    An organ of the International Labour Organization is a formal institutional body within the ILO’s governance structure, such as the International Labour Conference, the Governing Body, or the International Labour Office, that carries out specific functions related to setting, supervising, and implementing international labour standards and policies.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa3faa48190995b233af6525815 completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:45 p.m.