Triple

T21720732
Position Surface form Disambiguated ID Type / Status
Subject Dublin–Galway railway line E536148 entity
Predicate instanceOf P0 FINISHED
Object railway line in Ireland C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway line in Ireland
Context triple: [Dublin–Galway railway line, instanceOf, railway line in Ireland]
  • A. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • B. road in Ireland
    A road in Ireland is a public thoroughfare, ranging from narrow rural lanes to major motorways, that connects towns, cities, and regions across the Irish landscape and is classified and maintained according to national and local transport standards.
  • C. railway line in Portugal
    A railway line in Portugal is a defined rail corridor within the Portuguese rail network, consisting of tracks, infrastructure, and associated facilities that support train operations between specified locations.
  • D. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • E. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46c6dd88190a595375fa6ebd701 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:47 p.m.