Triple
T21702899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Auckland rail network |
E535697
|
entity |
| Predicate | hasLine |
P35
|
FINISHED |
| Object | Newmarket Line |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Newmarket Line | Statement: [Auckland rail network, hasLine, Newmarket Line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Newmarket Line Context triple: [Auckland rail network, hasLine, Newmarket Line]
-
A.
Cambridge to Newmarket line
The Cambridge to Newmarket line is a railway route in Cambridgeshire, England, linking the city of Cambridge with the market town of Newmarket and serving intermediate rural communities.
-
B.
Waterloo–Reading line
The Waterloo–Reading line is a suburban and regional railway route in southern England that connects London Waterloo with Reading, serving numerous commuter towns in Surrey and Berkshire.
-
C.
York–Scarborough line
The York–Scarborough line is a historic railway route in North Yorkshire, England, connecting the city of York with the coastal resort town of Scarborough.
-
D.
Barrie line
The Barrie line is a GO Transit commuter rail corridor in the Greater Toronto Area that runs between Toronto and the city of Barrie.
-
E.
Pinetree Line
The Pinetree Line was a Cold War-era chain of radar stations across southern Canada designed to provide early warning of potential Soviet air attacks on North America.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Newmarket Line Target entity description: The Newmarket Line is a key suburban railway corridor in Auckland, New Zealand, linking central city routes with the major junction at Newmarket and serving as an important part of the region’s commuter rail system.
-
A.
Cambridge to Newmarket line
The Cambridge to Newmarket line is a railway route in Cambridgeshire, England, linking the city of Cambridge with the market town of Newmarket and serving intermediate rural communities.
-
B.
Waterloo–Reading line
The Waterloo–Reading line is a suburban and regional railway route in southern England that connects London Waterloo with Reading, serving numerous commuter towns in Surrey and Berkshire.
-
C.
York–Scarborough line
The York–Scarborough line is a historic railway route in North Yorkshire, England, connecting the city of York with the coastal resort town of Scarborough.
-
D.
Barrie line
The Barrie line is a GO Transit commuter rail corridor in the Greater Toronto Area that runs between Toronto and the city of Barrie.
-
E.
Pinetree Line
The Pinetree Line was a Cold War-era chain of radar stations across southern Canada designed to provide early warning of potential Soviet air attacks on North America.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c46b44c0819088ab883ebd44e0e8 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69ef9b8161348190842c433531cfaa5b |
completed | April 27, 2026, 5:23 p.m. |
Created at: April 16, 2026, 6:46 p.m.