Triple
T2169821
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PSEG Long Island |
E48396
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power grid operator |
C359
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power grid operator Context triple: [PSEG Long Island, instanceOf, power grid operator]
-
A.
electric utility
chosen
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
public utility company
A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
-
C.
multinational utility company
A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
-
D.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
E.
television network operator
A television network operator is an organization that manages, schedules, and distributes television programming across broadcast, cable, satellite, or digital platforms to reach viewers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88aa3faa48190995b233af6525815 |
completed | March 4, 2026, 7:40 p.m. |
Created at: March 4, 2026, 7:45 p.m.