Triple
T21667404
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CANAMEX Corridor |
E534757
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international transportation corridor |
C2952
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international transportation corridor Context triple: [CANAMEX Corridor, instanceOf, international transportation corridor]
-
A.
transport corridor
chosen
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
B.
international road
An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
-
C.
trade and transportation corridor initiative
A trade and transportation corridor initiative is a coordinated program to develop and optimize key routes, infrastructure, and policies that facilitate efficient movement of goods and people across regions or borders.
-
D.
international railway
An international railway is a rail transport system or route that connects and facilitates the movement of passengers and freight between two or more countries across their national borders.
-
E.
cross-border transport link
A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c46898008190aa618a4af55bd1ee |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:37 p.m.