Triple

T2163304
Position Surface form Disambiguated ID Type / Status
Subject T1 subway train E46849 entity
Predicate constructionPeriodEnd P35488 FINISHED
Object 2001 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2001 | Statement: [T1 subway train, constructionPeriodEnd, 2001]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionPeriodEnd
Context triple: [T1 subway train, constructionPeriodEnd, 2001]
  • A. constructionDate
    Indicates the date on which an entity (such as a building or structure) was constructed or completed.
  • B. constructionTime
    Indicates the duration or specific point in time required to construct or build an entity.
  • C. reconstructionEndDate chosen
    Indicates the date on which a reconstruction process or project is completed.
  • D. constructionStartYear
    Indicates the calendar year in which the construction of something was begun.
  • E. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a184cbc8190877791f6552c2484 completed March 4, 2026, 7:38 p.m.
NER Named-entity recognition batch_69abbe8d105c819098371c35c88873dc completed March 7, 2026, 5:58 a.m.
PD Predicate disambiguation batch_69abbd9c90408190b6b65498ca43ce26 completed March 7, 2026, 5:54 a.m.
Created at: March 4, 2026, 7:45 p.m.