Triple

T21625201
Position Surface form Disambiguated ID Type / Status
Subject Uri, Baramulla district E533682 entity
Predicate hasHydroelectricProject P15311 FINISHED
Object Uri II Hydroelectric Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uri II Hydroelectric Project | Statement: [Uri, Baramulla district, hasHydroelectricProject, Uri II Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Uri II Hydroelectric Project
Context triple: [Uri, Baramulla district, hasHydroelectricProject, Uri II Hydroelectric Project]
  • A. Shanan Hydroelectric Project
    The Shanan Hydroelectric Project is a historic hydroelectric power plant in Himachal Pradesh, India, that harnesses the waters of the Uhl River to generate electricity.
  • B. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • C. Baspa II Hydroelectric Project
    Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
  • D. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • E. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Uri II Hydroelectric Project
Target entity description: Uri II Hydroelectric Project is a run-of-the-river power station on the Jhelum River in Jammu and Kashmir, India, built to generate electricity by harnessing the river’s flow near the town of Uri.
  • A. Shanan Hydroelectric Project
    The Shanan Hydroelectric Project is a historic hydroelectric power plant in Himachal Pradesh, India, that harnesses the waters of the Uhl River to generate electricity.
  • B. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • C. Baspa II Hydroelectric Project
    Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
  • D. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • E. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c464fba881908d0ff2ac80511ce1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef52121c3c8190b9b4d862ed247c71 completed April 27, 2026, 12:09 p.m.
Created at: April 16, 2026, 6:34 p.m.