Triple

T21625136
Position Surface form Disambiguated ID Type / Status
Subject Mangla Dam Raising Project E533681 entity
Predicate instanceOf P0 FINISHED
Object dam expansion project C45082 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dam expansion project
Context triple: [Mangla Dam Raising Project, instanceOf, dam expansion project]
  • A. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • B. dam removal project
    A dam removal project is an organized effort to plan, deconstruct, and remove a dam to restore natural river flow, improve ecosystem health, and address safety or infrastructure concerns.
  • C. Dam
    A dam is a large engineered barrier built across a waterway to control water flow, create reservoirs, and support purposes such as water supply, flood control, irrigation, and power generation.
  • D. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • E. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c464fba881908d0ff2ac80511ce1 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:34 p.m.