Triple
T21625134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pakistan national power grid |
E533680
|
entity |
| Predicate | criticalInfrastructure |
P7519
|
FINISHED |
| Object | true |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Pakistan national power grid, criticalInfrastructure, true]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: criticalInfrastructure Context triple: [Pakistan national power grid, criticalInfrastructure, true]
-
A.
significantInfrastructure
chosen
Indicates that an entity constitutes an important or critical piece of infrastructure within a system, network, or region.
-
B.
defenseInfrastructure
Indicates the existence or involvement of physical or organizational structures and facilities that support defense or protective capabilities between the related entities.
-
C.
criticality
Indicates the degree of importance, urgency, or potential impact associated with an entity, condition, or situation within a given context.
-
D.
relatedInfrastructure
Indicates that one piece of infrastructure is connected, associated, or functionally related to another infrastructure element.
-
E.
infrastructureImpact
Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c464fba881908d0ff2ac80511ce1 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69ef52121c3c8190b9b4d862ed247c71 |
completed | April 27, 2026, 12:09 p.m. |
| PD | Predicate disambiguation | batch_69e69677b9c48190bf81f795aa8ad74e |
completed | April 20, 2026, 9:11 p.m. |
Created at: April 16, 2026, 6:34 p.m.